Showing posts with label storefronts. Show all posts
Showing posts with label storefronts. Show all posts

Saturday, July 25, 2015

Two Busy Weeks: Archie Bray and Seattle

A little over a week ago I was in Montana for a workshop, "Pots, A Studied Approach" with Peter Beasecker at The Archie Bray Foundation in Helena. It was a week long workshop focused on throwing on the potter's wheel and functional pottery form. 

a wall made of ceramic pipe at Archie Bray

I signed up for the workshop with my students in mind. My own work is sculpture, but the majority of my students are generally focused on functional pottery. 

the view of Montana from the B&B where I stayed

The Archie Bray Foundation was an absolutely amazing place to be. Our workshop took place in the old pottery, about in the center of the campus. The Bray was originally a brick and pipe making factory and the old beehive kilns and some of the buildings are still around, though mostly in disrepair.

old buildings at Archie Bray

Walking around the Bray there is always something to look at, be it the old buildings, the new buildings, the site-specific artworks, the new artwork by resident artists or the abandoned work of the "boneyard."

ceramic pipes at Archie Bray

The Bray has had residents artists since the 1950s, and perhaps the studio where we took our class had been around since the beginning of the residency program. It was certainly an old and less cared-for space.

The Pottery (classroom studio)

Just outside of the pottery where we had classes is an area with a few picnic tables and some landscaping that seems superficially like flowerbeds, but instead of flowers, the beds mostly contain damaged pottery and ceramic sculpture from past resident artists and others who have made work, unsuccessfully, at the Bray.

the boneyard

These accumulations of cracked pottery, sculpture with glaze faults and teapots with lids glazed permanently shut are called the boneyard and can be found piled and stacked and hidden in locations all around the different buildings of the Bray.

cracked work in the boneyard (Jason Walker?)

At lunch and after class on the first day of my workshop I walked around the picnic area and later, the whole Bray campus looking at the abandoned or donated artwork. I continued to walk and look at most of the break times through the rest of the week and each time I noticed something I hadn't seen before.
wheel thrown and altered forms by Martha Grover and (Can somebody tell me who made the pice at the top?)

Of course its also lots of fun to play the artist's name guessing game. So many of the pieces are by well-known ceramic artists and there are so many pieces, that this game could be a fairly extensive one. Unfortunately I didn't discover an answer key while I was there.

the "railing" in front of one of the galleries at Archie Bray

On that first evening I also took a walk around the edges of the Bray to see the site specific installations by different artists. The most immediately noticeable of these is the round "shrine" across from the pottery classroom.

the Pottery Shrine at Archie Bray

 another fun game for Archie Bray: find all the tops (left)


Several of the large-scale works incorporated bricks and pipe that may have been from the original pottery business that pre-dates the Bray as an arts space.

 two large site-specific installations at Archie Bray (behind on the left, an old beehive kiln)

The space was almost overwhelmingly interesting. I would have been happy to visit and just spend several hours walking around the grounds, visiting the resident artist spaces and looking at the work in the three gallery spaces. I took far more photos than I could possibly share without boring my audience.

These things are neat, they were stuck into a gap in a building wall--I didn't see them until the third day.

However, the experience was also exhausting for a variety of reasons.  By the time the week was over, I was too ready to come home. The view of Mt Adams and a familiar valley as I cam down I-82 was a welcome sight after eight hours of driving, the last three through the monotonous flat brown landscape of Eastern Washington.

going home

Sadly, my driving break was short as I had to drive to Seattle twice last week. On Monday I de-installed my Storefronts exhibition on Mercer Street in South Lake Union. And on Thursday I went back to Seattle for my shift at CORE Gallery.


  
 my work at in South Lake Union

Sunday, April 5, 2015

Storefronts Installation in Seattle

Last week I installed some work in a window on Mercer Street in Seattle. The installation is part of a group of works by different artists installed in windows in the South Lake Union area as part of Shunkpike's Storefronts program. The work will be up through July. You can visit anytime, since the work isn't in a gallery, it's never closed (it is also never open).

my installation for Storefronts

The work is in a window on the south side of Mercer between Westlake Ave and Terry Ave. You can see the work from the car, if you're driving down Mercer. This weekend my family went to see the Pompeii exhibit at the Pacific Science Center and I pointed it out on the way there and on the way back. There is a second, larger installation to the east of mine if you're not sure where to look.

a view of Mercer street in front of my window

All the artists will be giving short talks and answering questions about their work on May 7 for the First Thursday Art Walk. I'll be going first, at 6pm. (For those of you in Yakima, May 7 is also the day of the clay sale at YVCC--you can buy your mother's day pottery from 12:30-1:30 in the HUB).

a view of my window from the parking garage

Installing the work was a challenge. My window is accessible through the parking garage, but I had to bring my own ladder. The window is pretty tall, about 10 feet, so I also needed a ladder inside the space. On the second day of installation, I brought two ladders. On the first day I climbed up the ladder into the window, then pulled the ladder up after me. 


I had to lift the work up into the window before I could climb in, it was a strange setup for planning

I'm not great with ladders and heights, so this was not my favorite part of the installation process. At one point both the woman in charge of all the windows and the woman next to me borrowed my ladder and left me stranded in or out of the window.

the long view down while I waited for the return of my ladder

Later, I knocked one of the pieces off the wall with my knee on the way down the ladder after doing adjusting the light at the top of the window. The piece broke, but luckily didn't knock anything else off the wall. I had extra work and was able to adjust the installation so that the missing piece wasn't a problem. Additionally, the piece that I knocked off the wall was and older piece. This piece was originally made for a similar installation I did several years ago. Those pieces had fairly small openings in the back for hooks. More recently I have been careful to create large openings in the back of wall pieces to accommodate large headed screws and/or L-hooks. 

"humpty" after it's fall
I had two days (during my spring break) to install the work. I probably could have done it in one, but there were a few things I didn't know about the space ahead of time. I actually learned quite a bit about this particular installation process. Next time I would just plan to paint the whole wall before I began. For some reason the person before me only patched the holes but didn't repaint. I would also bring a stool, two ladders, an extra light, a sanding block and an extension cord. 

the view up into the window during install

The particularly nice thing about a two-day installation is that I can have ladder-breaks. These are 10 minute walks that acrophobics take every time they install a couple screws up high. After 10 minutes on the nice solid ground, my hands have dried off and I have stopped shaking. 

The installation in progress before the fall (see how hard it is to read my name on the window)

The two day install also allow me a trip to Lowe's and a fabric store (don't go the Jo-Ann's in Renton, BTW) to collect all the things I forgot the first time.

After a trip to Jo-Ann's, the black fabric makes it easier to read my name, and hides the ugly paint-spattered plywood floor

The show is going to be up for quite a while, which means a bunch of people should get to see it. It also gives me a few more "shots" at getting the photography correct. During the day, photography outside the window is ridiculous, since the bright sun makes the photographer's reflection more visible than the work. 

look, it's me and a white truck

On the first day I stuck around until sunset, but my phone and camera batteries both gave up right as I started to take pictures. Even so, the shots I got had car light reflections instead of bright sky reflections. This week, I borrowed a polarizing filter from a friend, but I didn't have time to stick around until sunset, so the reflection of the clouds is darker, but the work is still hard to see.

pretty clouds

I plan to stick around after dark in May to try to take some more pictures with the polarizing filter. In the meantime, I have a few shots of the individual pieces. I took these from inside the window, so no reflection to worry about.




Sunday, March 29, 2015

Installation Preview, Spring Break Base, and New Work at Oak Hollow Gallery.

This last week I installed my work in a window on Mercer in South Lake Union for the Storefronts Program. It will be up until July, so I'll write about it later.

my installation (in progress)

Before I left for Seattle, I finish a base for another piece that will eventually have a bike wheel on it, maybe even a tree. Right now it's just a base. 

base in progress

I also fired some work for my installation and took some functional stuff (mugs and plates) to Oak Hollow Gallery.

base in progress later

Friday, March 6, 2015

One Show Down, One Show Coming Up in Seattle

Last weekend I drove to Seattle to take down my show at CORE Gallery in Seattle. I also met with a representative from Shunpike's Storefronts program. I will be installing my next "show" in Seattle later this month.



My work will be featured in a storefront on Mercer Street in the South Lake Union area of Seattle. I plan to show a wall installation of my sculpture. I'll install the work at the end of the month and it will be up for three or four months. I'm not sure how long, but I know it will be up in May because there will be a first Thursday art walk in early May.



I was hoping to make some new work for the show, but I'm not sure I'll have time at this point. The first week of March (and the last week of February) seem to have slipped by me fairly quickly.