Sunday, November 22, 2026

Two new sculpture stacks made in Summer-Fall 2026

 

the top parts of my newest finished work, started this summer
 
This summer I was working in the studio quite a bit, but I only built two new large stacked ceramic scuptures from scratch. The rest of my time was divided between finishing work from earlier, experimenting with paper sculpture, and making some functional work for the two shows I did in June and September. 
my studio during the summer


The two stacked pieces I started (and nearly finished) this summer are each made up of 3 main segments, each close to 25" tall, the interior height of my kiln. I was working with my new clay body, that I had tested last year, and thus was pretty sure could withstanding the weight of the build and the firings (so far so good).


bottom of one of my new builds

These pieces were lots of fun to build (way more fun to build than to glaze). I had been successful in building similar forms with straight walls previously, so I wanted to experiement, in these pieces, with some variations in the basic form.

the three main sections of the new build

The central form of the first piece was basically the same as the paper forms I shared earlier, a vertical form that gradually changed from a base as wide as my kiln to a narrow top. The big change was that I built in some sections where a separate bulb would be added later.


three sections during the first layer of underglazing

I actually made the bulbs beforehand, which turned out to be a mistake. It was nice to have these bulbs done before I was building the section they would attach to, but because they were fired already, the measurements were off. The openings in the main form were made to fit the fired bulbs, but I didn't account for the fact that the main form still needed to shrink through drying and firing. 


bulbs I used for planning bulb holders during building

One of the challenges with trying new things, is that you don't know everything yet. I had made the bulbs earlier because I wanted to use them separately. Then since they were built, I figured I could use them in planning these attachments. 

three pieces of two forms waiting to be fired

They were helpful for visualizing the forms as I build them, but I wasn't secure enough in the whole plan to have built them at the same time. If I were starting over, that's probably what I would do.

stack with paper mache bulbs that don't really fit

I was also considering making the bulbs out of paper mache, which I did do. But the paper mache forms were built on top of the cearmic forms and also don't fit as snugly as I'd like. At this point, I am planning to build new bulbs into the fired openings of the already built form. 

bulbs made after discovering the others wouldn't fit

This has the obviously disadvantage of shrinkage messing things up in the other direction. However, if they are too small, I can add to the surface to bring them back to an appropriate thickness (I think).

close up on texture of the twisting stack

The other new stacked form has a gentle twist. I wanted to build in a more significant counterweighted curve, but I wanted to build up my confidence at this scale first. A big curve could, first, risk being too wide for the kiln, if I stared it too low. At a higher level, it could risk the bottom being unable to support the top at the seam. It could also risk making a form that needed the next level to be balanced, making it harder to firie the sections separately.

based of the twisting stack, drying

As a first step, I built in a subtle shift and twist throughout all 3 levels of the form, with the biggest lean in the (lightest) top section. Similar to the other form, I designed this one to have separate top bulb, which allowed me to not worry about the weight during building, though I have to figure out fit now.

first layer of underglaze on the twisting stack

Though I finished building both of these forms in the summer, I didn't finish underglazing, glazing, and firing them until this fall. I finished glazing last two segments last week, and I have one segment left to fire, just as soon as I can get help loading it into the kiln (it's big, heavy, and awkward to load alone). Then I have the bulbs to build and finish (or just finish, if I decide to use the paper ones).


top of the twisting stack with a paper mache bulb

While I was getting frustrated by the slowness of glazing and, especially, flocking, I wasn't sure I was going to get these done, but last week I moved the finally, finished, flocking piece out of the studio and this weekend I was able to move the paper pieces back in and make some progress on them, so finishing by mid December seems more feasible now.

nine finished forms move d to the living room so I can keep working


Disclaimer: now that it has taken me most of 3 months to draft this post, I am going to post it now without close editing. Did I edit last time I worked on this two weeks ago? Maybe. Did I miss something embarassing? It's possible, but I will be distracted today before I hit publish if I don't hit publish now.